Opened in the Spring of 2005, this state-of-the-art refit complex was designed to provide the perfect conditions for refitting sailing and motor Yachts up to 70m in length. The building is dedicated to the memory of our first Chairman – Terry Vernon. There are two 75m x 24m wide dry docks, the inner of which is completely enclosed and equipped with an environmental control system for the highest quality paint jobs. Adjoining the inner dock is a three storey workshop complex (totalling 1400sqm) housing painting, engineering, hydraulic and electrical workshops, crew offices and extensive storage space.